Assuming that the "smBolter" option is the bolter whose selection count is controlled by the remainder link, you are correct. The selection count of a remainder link is determined after all of the exclusions have been tallied for all other links. There is no other way it can be done that I can think of. If you've got a nifty way of doing it, let me know and we'll put it on the todo list for a future release. :-)
-Rob
At 08:57 PM 7/14/2006, you wrote:
Quote:
I figured as much. Fortunately the units that have this option (Deathwatch for those interested), did not need absolutely need the Bolter as a remainder link.
Also, was I correct in assuming that the selection count, as referencing "unit.option[smBolter].selection", wouldn't be set until the remainder link was processed?
|