View Single Post
EricaOdd
Senior Member
 
Join Date: Nov 2013
Posts: 106

Old July 23rd, 2016, 11:29 AM
Switchable doesn't seem to work right either.

If I build a 12 point power (including 2 points for Switchable), it lets me build a 12 point power to switch to. It should only let me build a 10 point power.

The power you switch to has a point cost equal to the main power minus the Switchable cost.
EricaOdd is offline   #9 Reply With Quote